Overview Dashboard

Bulgarian chemical industry decarbonization - key indicators and progress

Latest available data · 2026
0
%
GHG Reduction since 1988
from 5,211 → 996 Kt CO₂eq
0
M€
Industry Turnover (2022)
45% export growth in 2022
19,493
Direct employees (2025)
45 operators with data · 9 without data
0
Active Companies in chemical industry
4.5% of industrial output
Total Industrial Processes and Product Use (IPPU) Emissions
Kt CO₂ equivalent · Sector 2 Industrial Processes and Product Use
Industrial Processes and Product Use (IPPU) Sector Breakdown (2024)
Industrial Processes & Product Use emissions
EU ETS Progress & 2030 Targets
Bulgaria's emission trading system installations performance
ETS emissions reduction since 2005 42%
Renewable energy share (2023) ~23%
Target: 34.48% by 2030
Chemical sector share of Industrial Processes and Product Use (IPPU) emissions 26.3%
Companies with emission-reduction actions (EIB 2025) 79%
EU average: 91%
Decarbonization Roadmap to 2050
Key milestones for the Bulgarian chemical sector
2022–2024
First-Wave Transition
Biomass co-firing at Solvay Sodi (30% share); Agropolychim dual-pressure nitric acid plant programme
2025–2030
Commercial CCUS & Pilot Electrolyzers
ANRAV project: 0.8 MtCO₂/yr capture at Devnya cement; pilot electrolysers for ammonia; Solvay Sodi coal phase-out; EU ETS free allocation reduction begins
2030–2040
Green Hydrogen Scaling & Process Electrification
Renewable hydrogen decisive for ammonia (feedstock switch); electrified process heat units; CO₂ transport network for Devnya/Varna cluster; CBAM fully operational
2040–2050
Net-Zero & Climate Neutrality
CCUS indispensable for residual process emissions; circular feedstocks mainstream; green ammonia standard; Bulgaria climate neutrality target
Source: Net-Zero Lab

Company Profiles

Profiles of the industrial participants included in Cluster Analysis

Decarbonization Pathways

Technology levers and transition routes toward net-zero

Green Hydrogen

Electrolytic hydrogen replacing fossil feedstocks and fuel

TRL 7–9 · Mid-term

How it works

Renewable electricity powers electrolysers to split water into hydrogen and oxygen. Green hydrogen replaces natural gas as feedstock in ammonia synthesis (Haber-Bosch process) and as fuel in high-temperature industrial processes.

Applicability in Bulgaria

  • Ammonia production (Agropolychim, Neochim) - largest near-term opportunity
  • Refinery hydrotreating units (LUKOIL Neftohim Burgas)
  • High-temperature heat for chemical processes
  • Agropolychim: blue ammonia integrated by 2026; green ammonia by 2030 (confirmed in company document)
  • First low-carbon ammonia delivery by Agropolychim: saves 5,450 tonnes CO₂ (document confirmed)

Key milestones

2025
55 MW electrolyser pilot capacity target (National H₂ Roadmap)
2026
Agropolychim: first blue ammonia delivery operational - 5,450 t CO₂ saved per delivery
2027
Agropolychim new calcium nitrate plant (50,000 t/yr) - runs on blue ammonia + RES
2030
7,800 t/yr renewable H₂ production from pilot projects
2035+
Green ammonia mainstream; decisive feedstock switch
90%+
CO₂ reduction potential for ammonia synthesis
€250M
Agropolychim 5-year investment programme

CCUS

Carbon Capture, Utilisation and Storage

TRL 6–8 · Long-term

How it works

CO₂ is captured from industrial process streams or flue gases, transported via pipeline, and stored permanently in geological formations (saline aquifers, depleted gas fields) or used as feedstock for chemicals and materials.

Bulgaria's CCUS potential

  • Estimated storage capacity: ≥2.6 Gt CO₂ (≈79 years of current emissions)
  • Offshore Black Sea storage (Galata depleted gas field)
  • Onshore saline aquifers
  • Devnya/Varna industrial cluster - ideal for shared CO₂ transport

Key projects

ANRAV
€600M assumed CCUS CAPEX split into €190M funded by the EU Innovation Fund (incl. €38M for geological storage) and €410M remaining project financing; 800,000 t CO₂/yr captured at Devnya (Heidelberg Materials); hybrid OxyCal + post-combustion technology; ANRAV.beta pilot completed; full-scale commissioning 2028. First full CCUS chain in Eastern Europe.
Holcim
Eastern Lights: €24.2M+ CO₂ storage research in NW Bulgaria saline aquifers. Beli Net Zero CCUS project (EU STEP Seal certified) - long-term target.
Post-2035
CCUS expected for chemical & refinery sector under Bulgaria's Long-Term Mitigation Strategy
2.6 Gt
Estimated CO₂ storage capacity
€190M
EU Innovation Fund share of €600M ANRAV CAPEX

Process Electrification

Replacing fossil fuel heat with renewable electricity

TRL 5–9 · Near-term

How it works

Electric heat pumps, resistance heaters, plasma furnaces and induction systems replace gas/coal-fired process heat. Most effective for low- and medium-temperature processes (<400°C) but advancing for high-temperature applications.

Sector applicability

  • Low-heat processes across most chemical sites - near-term opportunity
  • Ceramics: electrified firing where product and kiln allow
  • Constrained by grid capacity and electricity price in Bulgaria
  • Bulgaria's NECP does not yet propose specific electrification policies for industry

Barriers & enablers

Barrier
High electricity prices; grid capacity limitations; high capital cost of electrification retrofits
Enabler
Expanding renewables (55.51% RES electricity target by 2030); dedicated industrial electricity tariffs; EU funding
Policy gap
NECP lacks concrete electrification targets for industry - policy gap identified by CSD (2025)

Biomass & Alternative Fuels

Replacing fossil heat with biomass residues, RDF, tyres, biogas, and other qualified alternative fuels

TRL 8–9 · Near-term

How it works

Biomass and alternative fuels displace coal, petcoke, natural gas, and other fossil fuels in boilers, kilns, and steam systems. Eligible biomass residues are treated as biogenic under IPCC accounting, while RDF, tyres, biogas, and process residues lower fossil fuel demand and reduce exposure to ETS costs.

Current deployments

  • Solvay Sodi: biomass co-firing is already around 30% in one boiler, delivering about 20% CO₂ reduction; the next step is scale-up to 50% in CFB steam generators No. 7 and No. 8.
  • Biovet / Huvepharma: Greenburn® treats residual mycelium as biomass for carbon-neutral steam, with biogas from wastewater fermentation; the site reports 30% absolute CO₂ reduction over 2020–2023.
  • Holcim Bulgaria: approximately 90% fossil fuel substitution in clinker production using alternative fuels, contributing to 443 kg CO₂/t cement in 2023, the lowest specific emissions in the global Holcim Group.
  • Heidelberg Materials: RDF and tyre-feeding upgrade on kiln Line No. 7, including a 480 t/day shredder, supports about 60 kt CO₂/year reduction.

Deployment logic

Best fit
Steam boilers, cement kilns, pulp and paper recovery systems, and sites with stable biomass or waste-derived fuel supply.
Constraints
Sustainable biomass availability, fuel preparation, permitting, air-emission controls, and avoiding competition with higher-value material uses.
Bridge role
Alternative fuels can cut fossil emissions immediately while electrification, hydrogen, and CCUS mature for harder process emissions.
30%→50%
Solvay biomass co-firing scale-up target
~90%
Holcim alternative fuel substitution

Circular Economy

Reducing virgin material demand through waste valorization, bio-based products, and process redesign

TRL 5–9 · Phased

How it works

Circular routes reduce emissions by keeping carbon and materials in productive use for longer. The priority is to turn industrial by-products, biomass side streams, agricultural residues, and lower-value waste into higher-value products or process inputs instead of relying on virgin fossil or mineral feedstocks.

Specific opportunities

  • Orgachim: sunflower- and castor-oil-based coatings and resins support bio-based, low-VOC product development and lower dependence on fossil-derived inputs.
  • Solvay Sodi: e.Solvay electrochemical process under testing could reduce CO₂ by about 50% while saving water, salt, and limestone.
  • Solvay Sodi: bio-coke testing replaces metallurgical coke with wood charcoal in lime kilns as a circular bridge before full electrification.
  • Fertilizers: sulfur-containing complex fertilizers and soil conditioners can be produced from selected industrial, agricultural, and waste-derived streams.

Value levers

Products
Bio-based coatings, cellulose derivatives, low-VOC formulations, and specialty products improve value per tonne of feedstock.
Processes
Electrochemical production and process-water savings cut both direct emissions and resource intensity.
Waste streams
Organic, inorganic, agricultural, and industrial residues become inputs for fertilizers, soil conditioners, nano-products, and specialty materials where quality and safety specifications allow.
50%
Potential CO₂ reduction from e.Solvay if validated

N₂O Abatement

Nitrous oxide destruction at nitric acid plants

TRL 9 · Ready now

How it works

Catalytic N₂O destruction is installed in the tail-gas stream of nitric acid plants. N₂O (a greenhouse gas 265× more potent than CO₂ over 100 years) is decomposed into nitrogen and oxygen before release. This represents the highest-impact, lowest-cost decarbonization measure available to the fertilizer sector.

Why it matters for Bulgaria

  • Nitric acid plants: Agropolychim (Devnya) and Neochim (Dimitrovgrad)
  • N₂O abatement progressively adopted as Best Available Technique under EU IED
  • Cost-effective: high reduction efficiency at relatively low investment
  • Unlocks ETS carbon credits - economic benefit

Impact

90%+
N₂O removal efficiency
Low cost
Lowest abatement cost per tonne CO₂eq in fertilizers
Ready
Mature technology - no regulatory barriers
Priority action: N₂O abatement on nitric acid units is the most immediate "no-regrets" measure in Bulgaria's chemical sector. Agropolychim integrates near-zero N₂O into new HNO₃ plant design (€250M programme). Neochim urgently needs catalytic abatement installation: €3–6M → 277 kt CO₂eq/yr saved → payback <3 months.
Note: this pathway-level saving is substantially larger than the entire national 2.B.2 Nitric Acid CRF category (75.19 Kt CO₂eq for both plants combined, 2023 - see Emissions tab). Treat 277 kt as an unverified company estimate pending reconciliation with the official inventory, not as directly additive to the CRF total.
Pathway Comparison
Readiness, cost, and applicability across chemical subsectors
Pathway TRL Timeframe Abatement potential Cost tier Key sectors
N₂O Abatement 9 Now >90% N₂O · 277–295 kt CO₂eq/yr* Very Low (€3–8M) Neochim, Agropolychim (integrated in new plant)
Biomass co-firing 8–9 Now–2027 20–40% energy CO₂ Low–Med Soda ash, pulp, refining
Electrification 5–9 2025–2035 30–80% heat CO₂ Med All chemical sectors
Green Hydrogen 7–9 2030–2040 Up to 90% ammonia CO₂ High Fertilizers, refining
CCUS 6–8 2028–2050 Up to 100% residual CO₂ Very high All hard-to-abate
* Company N₂O abatement estimate; it exceeds the entire national 2.B.2 Nitric Acid CRF category (75.19 Kt CO₂eq for both plants combined, 2023 - see Emissions tab). Treat as an unverified upper-bound pending reconciliation with the official inventory.

Emissions Data

National GHG inventory · Industrial Processes and Product Use (IPPU) 2010–2024 · industrial sub-sectors through 2023

Official · 2023
Industrial Processes and Product Use (IPPU) Total Emissions 2010–2024
CRF Sector 2 · Kt CO₂eq · Official national inventory
Industrial Processes and Product Use (IPPU) Sector Breakdown (2024)
Industrial Processes and Product Use (IPPU) Sub-sectors Stacked — 2010–2024
Kt CO₂eq · categories 2.A–2.H and reported total
Industrial Processes and Product Use (IPPU) Data Table 2010–2024
Kt CO₂eq · CRF Sector 2
Key Industry Sub-sectors - Energy Combustion 2010–2023
Kt CO₂eq · 1.A.1.b Petroleum Refining (LUKOIL Neftohim Burgas) · 1.A.2.c Chemical Industry · 1.A.2.d Pulp & Paper
Chemical Process Emissions 2010–2023
Kt CO₂eq · 2.B.1 Ammonia production · 2.B.7 Soda ash production · 2.B.2 Nitric acid production
2023 Company-Level Attribution
Official CRF sector totals · company attribution where uniquely identifiable
* 1.A.2.c (Chemical Industry combustion: 1,090.29 Kt) covers all chemical manufacturers combined. Ammonia (2.B.1: 492.94 Kt) and Nitric Acid (2.B.2: 75.19 Kt) are split between Agropolychim and Neochim. Soda ash (2.B.7: 460.03 Kt) = Solvay Sodi exclusively. Petroleum Refining (1.A.1.b: 955.79 Kt) = LUKOIL Neftohim Burgas.
Sheet4: Detailed breakdown of Sector 1.A (Fuel Combustion) emissions for 2023 by sub-sector and fuel type · All values in Kt CO₂eq
Fuel Combustion by Major Group
Kt CO₂eq · 2023 · Sector 1.A
Manufacturing Sub-sectors - Fuel Mix 2023
Sector 1.A.2 · Liquid / Solid / Gas fuels
Full Fuel Combustion Table - Sector 1.A (2023)
Kt CO₂eq · Sub-sectors
* Biomass column: CH₄ and N₂O only (CO₂ from biomass is carbon-neutral per IPCC methodology and excluded from totals). Road transport total only - fuel-type breakdown unavailable in official report.
CBAM Exposure
Carbon Border Adjustment Mechanism analysis module
Under construction
Module in progress
CBAM exposure analysis is being rebuilt.
This tab is temporarily hidden while the methodology, scope, and company-level indicators are updated.

Structured Dataset

Tabular views of the dashboard's source data, history series, and company registry

6 generated tables

Policy & Regulation

The regulatory framework shaping Bulgaria's industrial decarbonization

EU
EU Emissions Trading System (ETS)
Active
Cap-and-trade covering all major Bulgarian chemical installations. Carbon price ~€65/t CO₂ (2024 average; base-case 2026 forward price used in the ROI/CBAM sections below is ~€85/t, Reuters analyst consensus Jan 2026). Free allocations being phased out through 2034. Chemical sector among "hard-to-abate" with partial free allocation.
Phase 4: 2021–2030, annual cap reduction 4.3%
Free allocation: Decreasing; sector benchmarks apply
Revenue use: Climate Change Mitigation Act - funds CCS & forestry
CB
Carbon Border Adjustment Mechanism (CBAM)
Active from 2026
Levies carbon cost on imports of Cement, Steel, Aluminium, Fertilizers, Electricity, and Hydrogen. Prevents carbon leakage. Currently covers 6 sectors. Feb 2025 Omnibus: 50-tonne de minimis threshold, removing 90% of smaller importers while retaining 99% of emission coverage.
Sectors: Cement, Steel, Aluminium, Fertilizers, Electricity, Hydrogen
Extension: All ETS sectors planned by 2030
Threshold: 50t de minimis (Feb 2025 Omnibus)
Certificate price: Q1 2026 €75.36/tCO₂; quarterly in 2026, weekly from 2027 (EC price page)
ETS2
EU ETS 2 (Buildings & Transport)
2028
New carbon pricing system for fuel suppliers covering buildings, road transport, and smaller industrial activities not in ETS 1. Bulgaria transposed Directive 2023/959 via amendments to the Climate Change Mitigation Act. Monitoring starts 2025, reporting 2026, compliance from 2028.
Phase 1: Monitoring 2026 (Bulgaria)
Phase 2: Allowance auctioning 2027
Phase 3: Full compliance from 2028
BG
Bulgaria National Energy & Climate Plan (NECP)
Under review
Sets Bulgaria's 2030 climate and energy targets in line with EU Fit for 55. Targets: 34.48% RES share in gross final energy, 55.51% in electricity, coal phase-out by 2038. Critiqued by CSD (2025) for lacking concrete industrial decarbonization policies - no specific measures for low-heat electrification or green hydrogen deployment.
RES target: 34.48% by 2030
Coal exit: 2038 (indicative)
Gap: No industrial electrification policy
H₂
Bulgaria National Hydrogen Roadmap 2023
Active
Overseen by Ministry of Innovation and Growth. Targets 55 MW electrolyser capacity by 2025 under pilot projects; 7,800 t/yr renewable H₂. Positions Bulgaria as Southeast Hydrogen Corridor hub. Aims to decarbonize chemicals, glass, and refineries via green hydrogen.
Target 2025: 55 MW electrolysers (pilot)
Production: 7,800 t/yr renewable H₂
Corridor: Southeast Hydrogen Corridor
RRF
Recovery & Resilience Plan (RRP)
€3.7B green
Bulgaria's RRP allocates €3.7 billion to green transition. Key measures: RES investment, electricity storage, green hydrogen technology, energy efficiency in buildings. Total INECP investment need: €42.7B over 2021–2030.
Green allocation: €3.7 billion
Instruments: Innovation Fund, Modernisation Fund, EIB
RES target 2024: 26% of gross final consumption
Available Funding Instruments
EU and national financing mechanisms for industrial decarbonization
EU Innovation Fund
EU
Funds €190M of the assumed €600M ANRAV CCUS CAPEX. Supports first-of-a-kind low-carbon technology demonstrations. Priority for chemicals and refining.
Just Transition Fund
EU
€1.2B approved for Bulgaria (2023) to reskill 15,000 workers in coal-dependent regions. Supports industrial transition in affected areas.
Modernisation Fund
EU
ETS auction revenues directed to energy system modernization. Available for grid upgrades and industrial energy efficiency.
EBRD Finance
Dev Bank
EBRD Country Strategy 2025–2030 prioritizes green economy transition. Equity, debt, guarantees, bonds for RES and industrial decarbonization.
Carbon Contracts for Difference (CCfDs)
Policy tool
Proposed instrument to de-risk first-of-a-kind decarbonization projects by guaranteeing carbon price floor. Recommended by Net-Zero Lab research.
EIB Climate Lending
Dev Bank
European Investment Bank climate finance available for Bulgarian green hydrogen, RES storage, and industrial energy transition projects.

Net-Zero Lab

Research unit at FEBA, Sofia University, translating climate-neutrality targets into evidence-based transformation

FEBA · Sofia University

Knowledge-based pathways for climate-neutral transformation

Net-Zero Lab is a unit established at the Faculty of Economics and Business Administration of Sofia University "St. Kliment Ohridski". It develops applied knowledge, analytical tools, and policy-relevant evidence to support just sustainable transformation in Bulgaria and the region.

InstitutionFEBA, Sofia University
FocusEnergy · Industry · Society
GeographyBulgaria and the region
ApproachEvidence-based, just transition
Core Expertise
Applied research and decision support for climate-neutrality implementation
01
Techno-economic assessments
Assessment of technology options in energy and industry, including cost, feasibility, emissions impact, and deployment pathways.
02
Decision-support tools
Energy-system simulation, optimization, regional technology roadmaps, and life-cycle carbon assessment for planning and policy decisions.
03
Societal transformation research
Applied research on skills, human-resource needs, social partnerships, citizen engagement, and community capacity for change.
Team
Current Net-Zero Lab team listed on the official site
Assoc. Prof. Dr. Atanas Georgiev
Director of the Net-Zero Lab
Dean at FEBA; Head of Department "Industrial Economics and Management"; Director of the "Energy Markets and Services" Master's programme.
Dr. Mariya Trifonova
Deputy Director of the Net-Zero Lab
Renewable-energy and transition expert with experience in coal-region participation and decarbonization pathway modelling.
Lyubimka Georgieva
Research Assistant in Citizens Energy
Works on renewable energy, active citizen engagement, women's empowerment in green transformation, data modelling, and analysis.
Bozhil Kondev
Research Fellow
Energy and climate expert focused on transition risks and sustainable finance, with international technical-assistance experience.
Maya Todorova
Project Coordinator
Coordinates workflows, communication, administration, and operational data support.
Remina Aleksieva
Research Fellow
Works on energy and climate policy, renewable energy, citizen engagement, and regulatory compliance.
Nursen Syuleyman
Research Assistant
Supports research projects through data collection, analysis, methodology, and strategic planning.
Mihail Georgiev
Research Fellow · Industrial Decarbonisation
Chemical engineer and physicochemistry researcher focused on sustainable industrial efficacy, decarbonization, and advanced characterization.
Partner With Us
Collaboration with business, institutions, and civil society

The lab works with partners on clean-energy markets, industrial process transformation, supply-chain sustainability, technology transfer, and cluster-based decarbonization strategies.

Open official site
Contact
Net-Zero Lab at FEBA, Sofia University
Institution Faculty of Economics and Business Administration, Sofia University "St. Kliment Ohridski"
Address 1113 Sofia, 125 Tsarigradsko Shose Blvd., bl. 3

ROI Analysis

How avoided ETS compliance costs compensate decarbonization investments - payback periods and cumulative cashflows 2026–2040

8 companies · Official data
△
Rising carbon prices transform decarbonization from a cost into a financial advantage. With the EU ETS price projected to reach €126–145/t CO₂ by 2030 and CBAM phased in at 48.5%, investments made today will generate returns that accelerate with every passing year.
Carbon price trajectory:
ROI_ETS Price Assumption
EU ETS price path used as the basis for CO₂ pricing predictions in the ROI model · €/tCO₂ · 2026–2040
Base selected
▲
0.2 yr
Best payback period
N₂O abatement at Neochim (€4.5M, 277 kt CO₂eq/yr)
⊙
2031
Sector break-even year
Committed investments, 8 companies
▲
€250M
Annual carbon savings 2030
All committed pathways, 8 companies
√
78%
Pathways with >10% IRR
Excluding long-term green ammonia
Payback Period by Pathway
Years from commissioning · sorted ascending · Base scenario
Company:
Cumulative Cashflow 2026–2040
Company:
ETS costs compensate decarbonization investments
Technology availability
All pathway groups enabled.
Cumul. Investment
Cumul. ETS avoided compliance cost
Net Position (break-even = 0)
Scenario Cashflow Snapshot 2026–2040
Investment plus Low / Base / High ETS and Net scenarios
Bars show Investment. Dashed lines show the ETS scenarios and solid lines show the matching Net scenarios.
Marginal Abatement Cost vs. ETS Price
When pathway cost falls below the ETS price - investment becomes self-financing. Threshold shown for base scenario 2026 (€85/t) and 2030 (€126/t).
Break-even carbon price = CAPEX (€) ÷ annual CO₂ saved (t). Investments below the ETS threshold line are profitable from day 1.
Full ROI Metrics by Pathway
Annual savings calculated as CO₂ reduced × ETS price · Base scenario · Payback from commissioning year
Pathway Company CAPEX (M€) CO₂ saved (kt/yr) 2026 saving (M€) 2030 saving (M€) Payback (yrs) Net by 2040 IRR signal
Carbon Price Sensitivity on Payback
How payback period changes across ETS price scenarios for key investments
Pathway
Low (€88/t 2030)
Base (€126/t 2030)
High (€165/t 2030)
Key driver
N₂O Abatement (both)
0.3–0.4 yr
0.2–0.3 yr
<0.2 yr
Extreme ROI at any price - deploy immediately
Coal Phase-Out (Solvay)
7.3 yr
5.4 yr
4.1 yr
Positive in all scenarios; committed
New HNO₃ Plant (Agropolychim)
12.4 yr
9.4 yr
7.1 yr
Committed; rising price accelerates return
Low-C H₂ (LUKOIL Neftohim Burgas, from 2030)
7.5 yr
5.0 yr
3.8 yr
Very attractive - pending decision
Solvay Lime Kilns Electrification (500–600 kt CO₂/yr, €320M)
5.9 yr
4.6 yr
3.5 yr
From document: 550 kt CO₂/yr savings · Strong ROI at all scenarios
ANRAV CCUS - Heidelberg Materials (800 kt CO₂/yr, €600M CAPEX)
10.0 yr
7.1 yr
5.6 yr
Gross model uses €600M CCUS CAPEX. Financing split: €190M EU Innovation Fund support and €410M remaining project financing. Payback from ETS savings. 2028 commissioning.
Biovet 300 MW PV + BESS (~€222M, ~320 kt CO₂/yr)
9.1 yr
7.0 yr
5.7 yr
100 MW already operational end-2024. ~€300M total programme for carbon neutrality by 2030.
e.Solvay Electrochemical (1,000 kt CO₂/yr, €500M - under testing)
9.5 yr
7.1 yr
5.4 yr
Revolutionary technology in testing. If validated, largest single decarbonization investment in sector.
Agropolychim €250M HNO₃ Programme (295 kt CO₂/yr)
12.4 yr
9.0 yr
7.0 yr
Confirmed €250M programme from document. Integrates N₂O abatement by design. 1.5 Mt/yr capacity.
Model Assumptions
ETS price trajectory
Base: Reuters analyst consensus (Jan 2026). High: BNEF base case (€145/t in 2030, €175/t in 2036). Carbon price outlook (Drive).
N₂O saving calculation
~5.5 kgN₂O/t HNO₃ reduced (no abatement → tertiary). GWP100 = 265. Calyx Global (1t N₂O ≈ 273 tCO₂e).
Cashflow model
Capex and CO₂ figures from company documents. Cashflow uses avoided ETS compliance cost, not full ETS price: avoided CO₂ × ETS price × paid ETS share. CBAM-sector paid share follows the official free-allocation phase-out. Non-CBAM sectors use a separate explicit free-allocation assumption. Optional CBAM adjustment is a market proxy, not a legal CBAM cost for EU producers.
IRR signal thresholds
>10% IRR: payback <7 yr. 5–10%: payback 7–14 yr. <5%: payback >14 yr. Near-zero or negative: >20 yr. Consistent with US DOE Chemicals Liftoff (>10% IRR threshold).
ROI Calculation Formulas
Notation: CAPEX is in M€, CO₂ savings are in ktCO₂e/year, ETS and CBAM certificate prices are €/tCO₂, and all annual outputs are in M€ unless stated otherwise.
Pathway annual ETS value
annual_saving_y = CO2_saved_kt × ETS_price_y / 1000
Used for the payback chart, ROI table 2026/2030 savings, sensitivity table, and simple pathway screening.
Payback period
payback_years = CAPEX_MEUR / annual_saving_commissioning_year
If a pathway starts before 2026, the 2026 ETS price is used. Pathways with zero direct CO₂ savings are shown as enablers.
Net by 2040
net_2040 = Σ annual_saving_y - CAPEX_MEUR
The sum starts in the commissioning year and runs through 2040. This is the net value shown in the ROI metrics table.
Marginal abatement cost
break_even_price = CAPEX_EUR / annual_CO2_saved_t
Shown as €/tCO₂ in the MAC chart. A pathway below the ETS threshold line is cheaper than paying the carbon price on the same tonnes.
Cashflow CAPEX deployment
investment_y = CAPEX_MEUR × capex_fraction_y
Cumulative investment is Σ investment_y. The chart plots this as a negative line so outflows are visible below zero.
Cashflow ETS avoided compliance cost
ets_savings_y = CO2_saved_kt × ETS_price_y × paid_ETS_share_y / 1000
This is the cashflow-specific savings formula. CBAM-sector installations use the official CBAM-linked free-allocation phase-out; non-CBAM sectors use the separate free-allocation assumption.
Paid ETS share
paid_ETS_share_y = CBAM_schedule_y OR non_CBAM_assumption_y
CBAM-sector schedule: 2.5% in 2026, 5% in 2027, 10% in 2028, 22.5% in 2029, 48.5% in 2030, 61% in 2031, 73.5% in 2032, 86% in 2033, 100% from 2034. Non-CBAM sectors use the explicit model assumption in code.
Optional CBAM market proxy
cbam_proxy_y = volume_t × emission_factor × certificate_price_y × CBAM_paid_share_y × pass_through_share / 1,000,000
Only included when “Include CBAM market adjustment” is ON. It is a market adjustment proxy, not a direct legal CBAM cost for EU producers.
Cumulative net cashflow
net_position_y = Σ[(ets_savings_y + optional_cbam_proxy_y) - investment_y]
Break-even occurs when cumulative net position reaches or crosses zero.
Signed log y-axis
chart_value = sign(x) × log10(1 + abs(x))
Used only when the cashflow log toggle is ON, so positive and negative values remain visible on the same axis. Tooltips show the original M€ values.
N₂O abatement input
CO2e_saved_kt = HNO3_output_t × N2O_reduced_kg_per_t × GWP100 / 1,000,000
Used to derive nitric-acid abatement pathway inputs where production and N₂O reduction factors are the underlying source data.
IRR signal proxy
IRR_signal = threshold(payback_years)
>10% IRR if payback is below 7 years; 5–10% if 7–14 years; <5% if 14–20 years; very long-term above 20 years.
Scenario and KPI aggregation
annual_carbon_savings_2030 = Σ(CO2_saved_kt × ETS_price_2030 / 1000)
The 2030 savings KPI sums all pathways commissioned by 2030 under the selected ETS price scenario. Company-level cashflow aggregates sum annual investment, ETS savings, CBAM proxy, and net position across the selected companies and enabled technology groups.

CBAM & ETS Cost Calculator

Estimate 2026–2034 carbon cost exposure from CBAM-linked free allocation phaseout and EU ETS assumptions, by company and product

Live Formula · Apr 2026
Formula Annual cost (€) = Volume (t) × Emission factor (tCO₂/t) × CBAM phase-in factor (%) × ETS price (€/tCO₂)
EC CBAM Regulation →
Carbon Price Scenario
Production / Export Volumes

Enter annual volumes (thousand tonnes). Pre-filled with estimated typical values.

Agropolychim AD
CBAM-covered
Ammonium Nitrate (AN/CAN)
EF: 1.18 tCO₂/t · CBAM in scope
kt/yr
UAN Solution
EF: 0.85 tCO₂/t · CBAM in scope
kt/yr
Nitric Acid (HNO₃)
EF: 0.23 tCO₂/t · CBAM in scope
kt/yr
Neochim AD
CBAM-covered
Ammonia (NH₃)
EF: 1.57 tCO₂/t · Official benchmark
kt/yr
Nitric Acid (HNO₃)
EF: 0.23 tCO₂/t · CBAM in scope
kt/yr
Solvay Sodi Bulgaria AD
ETS exposure (non-CBAM)
Soda Ash (light + heavy)
EF: 0.90 tCO₂/t · ETS Annex I · CBAM ext. 2030+
kt/yr
LUKOIL Neftohim Burgas
ETS exposure (non-CBAM)
Refined Petroleum Products
EF: 0.42 tCO₂/t · ETS Annex I (refinery)
kt/yr
Heidelberg Materials Bulgaria
CBAM-covered
Cement clinker / cementitious output
EF: 0.72 tCO₂/t · CBAM cement scope
kt/yr
Holcim Bulgaria AD
CBAM-covered
Cement clinker / cementitious output
EF: 0.62 tCO₂/t · CBAM cement scope
kt/yr
Biovet / Huvepharma
ETS exposure (non-CBAM)
Veterinary pharmaceutical products
EF: 0.18 tCO₂/t · ETS exposure proxy
kt/yr
Orgachim AD
ETS exposure (non-CBAM)
Paints, varnishes & resins
EF: 0.35 tCO₂/t · ETS exposure proxy
kt/yr
2026 exposure
Pending
Calculating…
2030 exposure
Pending
Calculating…
Cumulative 2026–2034
Pending
All companies combined
Annual Carbon Cost Exposure 2026–2034
CBAM-linked and EU ETS cost exposure · Base scenario
Year-by-Year Breakdown
All values in M€ · includes CBAM-covered & ETS-only products
Year CBAM factor ETS price Agropolychim Neochim Solvay Sodi LUKOIL Neftohim Burgas Heidelberg Holcim Biovet Orgachim Total (M€)
Methodology & Assumptions
CBAM phase-in schedule
Official EU schedule: 2.5% (2026) → 5% → 10% → 22.5% → 48.5% → 61% → 73.5% → 86% → 100% (2034). Fertilizers/NH₃ in scope from 2026. Source: Climat.be
ETS price scenarios
Base: Reuters analyst consensus Jan 2026 (€85–145/t). Low: conservative Enerdata scenario. High: GMK Centre upper range. Source: Reuters/GMK Centre
Emission factors
AN/CAN: 1.18 tCO₂/t (EBRD 2023). NH₃: 1.57 tCO₂/t (official CBAM benchmark, Argus/EC). HNO₃: 0.23 tCO₂/t. Soda ash: 0.90 tCO₂/t. Refining: 0.42 tCO₂/t. Cement and non-CBAM chemical product factors are indicative proxies for dashboard screening.
Scope & limitations
Official CBAM sectors are Cement, Steel, Aluminium, Fertilizers, Electricity, and Hydrogen. In this dashboard, fertilizer/NH₃ and cement exposure is modeled directly; soda ash, petroleum, pulp, pharmaceutical products, and resins are shown as ETS/non-CBAM exposure proxies unless future CBAM extensions apply. Volumes are user inputs. Results are indicative, not compliance-grade.

Cluster Analysis

Scenario matrix showing how each policy scenario changes the model inputs.

Password required

Enter the access password to open Cluster Analysis. Access remains unlocked until you reload this page.

Industrial Geography

Bulgaria's industrial operator register, with main-activity filters, 2025 emissions and a separate view of the 2024 installation baseline.

Operator register · 2024–2025

Infographics

Emissions, industry and transition pathways in a visual series.